Thursday, October 11, 2012

Three to get ready

We were sure everything was ready on our boat and soon found out differently.  The other boats we were traveling with also had some challenges along the way.  Here's the starting group.



"Our Little Cape"  with Captain Mike.




"Heron"  with Captain Hank.

We had a generator problem the first day out and had to do a temporary rewire to keep food from thawing.  We also had issues with the engine charging system which Captains Mike and Hank were able to fix for us.  We got some pictures of the trip and will post them soon.  We are happy to say after problem solving for two weeks we finally found a fix to the generator issue.  We should have more on that later.  Otherwise it was three to get ready.

No comments:

Post a Comment